Precision parts from UK plants to US customers

What has changed on the US route

Since 2025, two things have got harder for a UK exporter, and neither is the sea crossing.

Tariffs and origin. Duty now depends on what the part is and where it was made, not where it ships from. The two mistakes we see most: a part classified under the wrong code, and goods assumed to originate in the UK because they left from here. Both get found at the US border, which is the expensive place to find them. We classify before we quote, and we pre-calculate the duty on the first quotation so the landed cost is known before the booking, not after.

The filings. AMS and ISF are the two that catch people. ISF has to be lodged 24 hours before the container is loaded onto the vessel, and a missed deadline means a fine and a held box. The other failures are quieter: a bill of lading that disagrees with the invoice, or a manifest that does not match either. The fix is dull and it works: every commercial document goes to the US side before the container reaches the UK port.

What we handle

The export, start to finish, whichever way it travels.

Classification and duty, agreed before the quote.

Booking and space. Vessel space on the US routes runs short; we book early rather than hope.

Documents and filings. Commercial invoice, packing list, bill of lading, AMS and ISF, all consistent with each other and all lodged before the UK port.

The US side. Entry filed by our US broker, or your Importer of Record, with the documents already in their hands.

Sea, air or both. Planned volume by sea. The balance, or the urgent part, by air. The same desk handles each.

When the order is not all ready on the day

Sometimes the box is booked and the last pallet is still on the line. There are two ways to handle that: ship what is ready and fly the rest at four times the cost, or ask the question a week earlier and hold the booking. We ask the question.

‍

Services for Engineering and Industrial

Heavy Machinery

Sea and road freight for heavy machinery and industrial equipment. Specialist trailers and abnormal load permits for road; break-bulk and project cargo for sea. UK, Europe, and international corridors.

Machine Parts

FCL, LCL, FTL, and LTL for machine parts and industrial components. Just-in-time and breakdown response for UK and European supply chains.

Steel Pipes

Sea freight for steel pipes and structural sections; road freight with flatbed and specialist trailers across the UK and Europe.

UK import and export customs, including UK to Turkey, UK to US, and European corridors. Documentation, classification, and duty advice.

What we move for UK engineers

  • Aerospace components, the largest share of what we ship on this route
  • Automotive components, including forgings, castings and machined parts
  • Pumps, valves, compressors and their spares
  • Machinery and the parts to keep it running
  • Fasteners, seals, gaskets and precision consumables

How it goes wrong, and what we do about it

No space on the vessel. Book early. On this route the forwarder who waits for the order to be finished before booking is the one who misses the sailing.

A tariff change between quote and arrival. Duty calculated and shown on the first quotation, so a change is a conversation, not a surprise invoice.

A missed filing. Every document to the US broker before the container reaches the UK port. If the paperwork is complete before the box moves, the deadline cannot be missed.

‍

How We Help: Real Scenarios

Sea, air or both

Planned volume by sea. The balance, or the urgent part, by air. The same desk handles each.

Classification and duty, before the quote

We classify before we quote and pre-calculate the duty on the first quotation, so the landed cost is known before the booking, not after.

Frequently Asked Questions

Who pays the US duty?

That depends on your terms with the customer. We tell you what the duty will be before you agree the price, so the answer is yours to make rather than a surprise at the border.

How long does sea freight take, door to door?

Typically 10 to 18 days, depending on the UK port you leave from and the US port you arrive at. We give you the number for your lane on the quote, not a brochure average.

Our shipment is small. Is a full container the only option?

No. Under about 15 cubic metres we would usually consolidate rather than book a 20-foot box, and under about 20 cubic metres rather than a 40-foot. Smaller, regular shipments often suit a consolidation better than a container of their own.

What documents do you need from us?

The commercial invoice and the packing list, early. We build the bill of lading and the US filings from those, and we check that all three agree before anything is lodged.

How fast do we get a quote?

A person on the desk comes back within 15 minutes during the working day.

Get a quote

Origin, destination, what it is and when it is ready. A person replies within 15 minutes, not a portal.
} })) } } })